Overview

The Wekano water stop is a high-performance water barrier made of high-quality flexible PVC. It is engineered to be cast into concrete joints in water-retaining structures, acting as an impermeable dam that cuts the water path through construction joints and expansion joints.

Multiple ribs ensure full bond with the concrete and lengthen the water path, making leakage virtually impossible. The strip also resists chemicals found in sewage and soil — an essential element for swimming pools, water tanks and basements.

Technical Specifications

PropertyValue
Base materialHigh-quality, flexible polyvinyl chloride (PVC)
Strip widthMultiple sizes (e.g. 200 mm, 250 mm) per structural design
Roll length15 linear metres (standard roll)
Joint typeConstruction joints and expansion joints
Chemical resistanceChlorine, seawater, mild acids and sewage
Tensile strength and elongationVery high — withstands building movement and concrete pressure without tearing

Key Features

  • Prevents water passage in both directions
  • Multiple ribs for full bond with concrete
  • Resistant to chlorine, seawater and sewage
  • Heat-weldable joints for continuous protection

Applications

  • Kicker joint between base slab and wall
  • Construction joints in floor slabs
  • Horizontal and vertical wall joints
  • Joints between walls and roof slabs
  • Swimming pools, water tanks, sewage works and basements

Application Guide

  1. 01

    Positioning and fixing

    Fix the strip exactly in the middle of the wall or slab thickness using clips or tie wire to the reinforcement to prevent movement during pouring.

  2. 02

    First pour

    Pour concrete to fully embed half of the strip width. Vibrate carefully to avoid honeycombing around the strip.

  3. 03

    Second pour

    After the first pour has set, pour the remaining concrete to embed the other half, creating a continuous water barrier.

  4. 04

    Welding and joints

    Where a new length is needed, heat-weld the ends with a heating blade to keep the barrier continuous.

Technical Data Sheet

PDF
Data sheet on request Our team will help you select the right product for your project.

Related Products

View all products

Bitumen & Waterproofing

Wekano Bitumen Primer

A low-viscosity liquid bitumen coating that penetrates deep into concrete pores, sealing capillaries and improving adhesion of the waterproofing membranes…

Need help choosing the right product?

Talk to our technical team for product recommendations, quantities and pricing for your project.